Low Level (Non-Notifiable) Scaffolding

View Dates & Book

View Dates
& Book

  • Total
  • All prices exclude GST
  • 1 Day
  • 6 attendees
  • $483.00pp (ex GST)

Overview

This course teaches how to work safely to erect non-notifiable and prefabricated frame scaffolding up to five metres in height and does not require a Certificate of Competence or notification to WorkSafe NZ. It is ideal for residential construction scaffold requirements.

Prerequisites

A relevant level of physical fitness and ability to work at heights

Public Course Bookings

To find a suitable date and book a public course, simply use the online booking tool above, contact one of our sales support team on 0800 267 476 or use our contact us form.


Company Course Bookings

To run this course at your workplace please use the contact us form or contact our sales support team on 0800 267 476.

Can I have a career in scaffolding?

A career in scaffolding can be very rewarding. Qualified and competent scaffolding professionals are sought after around the world. New Zealand has a large industry with a lot of opportunity to develop a career in scaffolding. Let scaffolding take you places.


How does Axiom scaffolding courses work for industry?

Based on feedback from the scaffolding industry, our range of scaffolding courses has been designed to fit the time frames and costs of businesses, minimising the days that staff are off-site. Axiom Training is able to deliver the short courses at your site.


Does Axiom Training work with SARNZ?

Yes, Axiom training is an associated member of SARNZ and maintains strong relationships to ensure the very best course offerings.

Upcoming Course Dates
Loading...
Course Content
  • Demonstrate the knowledge of non-notifiable prefabricated scaffolding
  • Undertake and implement a task analysis for the erection, use and dismantling of non-notifiable prefabricated frame scaffolding up to five metres in height
  • Erect, alter, inspect and dismantle completed non-notifiable prefabricated frame scaffolding up to five metres in height
NZQA Unit Standard Included

9184: Erect and dismantle non-notifiable prefabricated frame scaffolding up to five metres in height